The 7 railway bridges designed by ECM to Section 2 of the Nacala Corridor (Moatize / Malawi section) are already completed. These bridges are between 1 and 3 bays, each one is 20m in length.
The railway bridge which provides rail unevenness between the new Nacala line and the Sena line is completed and in service.