Moncorvo, Portugal
Complementary Works related with the hidroeletric exploitation: Access to the two dams and design of various roads and paths, with a total extension of about 50 km, in a hilly area; 3 Bridges with total lengths from 177m up to 292m, piers height up to 50m and span lengths from 39m up to 42m, and 2 viaducts; 1 water-supply channel with a total length of 850m, including a mining tunnel with 508m; 20 small dams; 8 buildings, including the transfer of sanctuaries; Environmental requalification of a 7km stretch of Vilariça River; Shelter tunnel for bats; Projects related with the construction sites.
• Projects for the public tender phase, preliminary studies, detail designs and technical assistance to the works.