Moatize, Tete, Moçambique
Diversion of the Railroad in Moatize, of about 3 km, including an overhead passage for machinery and mining equipment pass through, so it doesn’t interfere with the mining process.
• Master Plan – Layout and technical solutions conception;
• Estudo Prévio – Pormenorização do traçado em planta e em perfil e definição de obras de arte;
• Final Design – Plan detail, transversal and longitudinal profiles and complementary special structures.