Railway bridges in Section 2 of the Nacala Corridor

27.04.2015

The 7 railway bridges designed by ECM to Section 2 of the Nacala Corridor (Moatize / Malawi section) are already completed. These bridges are between 1 and 3 bays, each one is 20m in length.

 

Tilting bridge between the Nacala line and the Sena Line in Moatize, Tete

30.04.2015

The railway bridge which provides rail unevenness between the new Nacala line and the Sena line is completed and in service.